Mining
The dry mining fleet uses conventional earth moving equipment. Dry mining activities excavate in Lanti Dry and Gangama deposits. Each of these sites have two concentrators.
Processing
Mineral concentrate from Lanti Dry and Gangama are processed in the company’s mineral separation plant, which includes a feed preparation plant and dry plant. The mineral separation plant has a capacity of 175 thousand tonnes of rutile per annum.
Transport
Products from the mineral separation plant are transported by truck to Sierra Rutile’s port.
Location | Moyamba and Bonthe districts, Sierra Leone |
Mines | Lanti dry mine Gangama dry mine |
Expansion projects | Sembehun mine |
Assets | Dry mining fleet Four dry mining concentrator plants Mineral separation plant Port and shipping fleet |
Products | Rutile, titanium dioxide minerals Ilmenite Zircon |